1) Price Term: FOB Ningbo Port, China.2)Payment term: TT (30% deposit, the balance70% before delivery)3) Delivery time: 90working days after receiving the deposit4) After sale service:1.Spare parts guarantee for one year from the date of installation.
Heavy Duty Concrete Mixer With high power and 2-stage size gears, the paint mortar mixer produces high torque and therefore high mixing performance. Idle speed can be increased by 150 to 300 rpm in 1st gear and 300 to 650 rpm in 2nd gear. Low speed, high
Depending on the needs of the application, we can design and integrate the laser into production lines, build a robotic workplace or supply a portable mobile laser for a wide range of applications.
The standard progressive cavity pump has no coupling, the prime mover bears the axial force of the progressive cavity pump, and connects the drive end and the pump end flange into a whole.Flow range: 0.1—300m³/HPressure range: 0 - 2.4Mpa or higher
CNC Machine Spare Parts select high-quality materials and is made by numerical control processing. According to the different materials selected, the parts produced also have different characteristics. They have some characteristics of metal materials, wi
The ice maker is a kind of refrigeration mechanical equipment that generates ice after water is cooled by the refrigerant of the refrigeration system through the evaporator.
Bridge girder launcher is suitable for highway or railway bridge construction. Its main function is to lift prefabricated concrete beams onto prefabricated piers.
Desiccant Dehumidification Wheel in our factory are made with nest ceramic or glass fiber and silica gel and molecular sieve as the dehumidification medium. They are Munters Desiccant Wheel Replacement with same effect as Munters wheel.